{"id":23202,"date":"2026-09-27T14:02:12","date_gmt":"2026-09-27T14:02:12","guid":{"rendered":"https:\/\/icv-controlling.com\/?post_type=events&#038;p=23202"},"modified":"2026-10-03T16:05:26","modified_gmt":"2026-10-03T16:05:26","slug":"ai-supported-assessment-of-complexity-costs","status":"publish","type":"events","link":"https:\/\/icv-controlling.com\/en\/events\/ai-supported-assessment-of-complexity-costs\/","title":{"rendered":"AI-Supported Assessment of Complexity Costs (in English)"},"content":{"rendered":"<section id=\"acf-block-6744b31dd34ec\" class=\"text-module bg-bg-default text-text-default  dark:!bg-dark dark:!text-white\">\n  <div class=\"max-w-screen-2xl spacing-px mx-auto spacing-py\">\n          <div class=\"lg:mb-lg mb-md\">\n        <div class=\"content-top max-w-3xl align-left \">\n          <h2 class='headline-element align-left typo-h2 font-bold'>AI-Supported Complexity Cost Assessment<\/h2><div class='text-element align-left typo-h4 mt-6'>From Value Stream Mapping to Scalable Decision Support \/ ICV Live Webinar<\/div>        <\/div>\n      <\/div>\n          <div class=\"typo-body text-element max-w-3xl align-left \">\n        <p><img decoding=\"async\" src=\"https:\/\/icv-controlling.com\/wp-content\/uploads\/2026\/09\/ICV-Live-Webinar_Peter_Greiner.jpg\" alt=\"\"><\/p>\n<p>In industrial companies, meeting changing market and customer demands often requires a broad range of products leading to increasing product variety This creates complexity across parts, modules, processes, and organizational activities. While direct costs are usually well understood, the indirect costs caused by complexity are often difficult to identify and allocate, potentially distorting product and portfolio profitability.<br \/>\nValue Stream Mapping provides a foundation for assessing these costs, but conventional approaches are often time-consuming, heavily dependent on expert judgement, and difficult to use for dynamic forecasts and simulations.<br \/>\nThe ICV Live Webinar demonstrates how AI-supported complexity cost assessment, combined with Activity-Based costing, enables a step change which can make indirect complexity costs fully transparent and scalable. A live demo shows how cost relationships can be visualized and how the same data foundation can be used for forecasts, simulations, and improved business decisions.<\/p>\n      <\/div>\n      <\/div>\n<\/section><section id=\"acf-block-6a58b51864cb1\" class=\"text-image-module bg-bg-default text-text-default \">\n    <div class=\"dark:!text-white dark:!bg-dark\">\n        <div class=\"max-w-screen-2xl spacing-px spacing-py mx-auto\">\n            <div class=\"content-top max-w-3xl align-left \">\n                <h2 class='headline-element align-left typo-h2 font-bold'>Speaker<\/h2>            <\/div>\n            <div class=\"grid grid-cols-1 2xl:gap-offsetMd gap-md lg:mt-lg mt-md\">\n                <div class=\"text-image-single flex max-lg:flex-col\">\n      <div class=\"image-box lg:w-1\/2 \">\n        <div class=\"image-box-img overflow-hidden aspect-square \">\n          <img loading=\"lazy\" decoding=\"async\" width=\"734\" height=\"840\" src=\"https:\/\/icv-controlling.com\/wp-content\/uploads\/2026\/02\/Dr_Peter_Greiner.jpg\" class=\"h-full w-full object-cover z-0 transform scale-105 transition duration-300\" alt=\"\" srcset=\"https:\/\/icv-controlling.com\/wp-content\/uploads\/2026\/02\/Dr_Peter_Greiner.jpg 734w, https:\/\/icv-controlling.com\/wp-content\/uploads\/2026\/02\/Dr_Peter_Greiner-262x300.jpg 262w\" sizes=\"(max-width: 734px) 100vw, 734px\" \/>        <\/div>\n      <\/div>\n      <div class=\"content-box lg:w-1\/2 flex flex-col justify-center bg-bg-transparent \">\n        <div class=\"content-box-inner  image-side-left \">\n          <h4 class='headline-element align-left typo-h3 font-bold'>Dr. Peter Greiner<\/h4><div class='text-element align-left typo-body mt-xs'><p>Dr. Peter Greiner has worked as an international business consultant since 2023, based in Stockholm, Sweden, and currently serves as Operations Officer Germany for the North European Modularization Network.<br \/>\nHe has over 30 years of experience in international controlling in various roles at local, regional, and global levels, gained through his work with the multinational home appliance manufacturer Electrolux AB. He is absolutely passionate about controlling and loves to share his expertise and experience. He is particularly interested in exploring the connection between financial metrics and business activities.<br \/>\nDr. Greiner has been a member of the ICV (International Association of Controllers) for more than 20 years. He is the head of the ICV workgroup Sweden and is the moderator of ICV webinars. He is also listed as a Senior Expert in the consulting division of the Controller Akademie.<br \/>\nDr. Peter Greiner studied physics at the Julius Maximilian University of W\u00fcrzburg, where he earned his doctorate in experimental physics. He received his controlling education at the Controller Akademie. He lives in Stockholm and Hamburg.<\/p>\n<p><strong>Dr. Peter Greiner, Consultant, Operations Officer <a href=\"https:\/\/modularization.net\/\" target=\"_blank\" rel=\"nofollow noopener\">North European Modularization Network NEM<\/a><\/strong><\/p>\n<\/div>        <\/div>\n      <\/div>\n    <\/div>\n            <\/div>\n        <\/div>\n    <\/div>\n<\/section>","protected":false},"excerpt":{"rendered":"<p>The ICV Live Webinar uses real-world examples to highlight the most common causes of conflicting reports. Stefan Maxones explains why data quality, data governance, and a robust reporting architecture form the foundation of successful AI and analytics initiatives. <\/p>\n","protected":false},"featured_media":23207,"template":"","events-series":[],"events-category":[198,195],"events-tags":[],"class_list":["post-23202","events","type-events","status-publish","has-post-thumbnail","hentry","events-category-icv-live-webinar","events-category-online-en"],"acf":[],"_links":{"self":[{"href":"https:\/\/icv-controlling.com\/en\/wp-json\/wp\/v2\/events\/23202","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/icv-controlling.com\/en\/wp-json\/wp\/v2\/events"}],"about":[{"href":"https:\/\/icv-controlling.com\/en\/wp-json\/wp\/v2\/types\/events"}],"version-history":[{"count":8,"href":"https:\/\/icv-controlling.com\/en\/wp-json\/wp\/v2\/events\/23202\/revisions"}],"predecessor-version":[{"id":23228,"href":"https:\/\/icv-controlling.com\/en\/wp-json\/wp\/v2\/events\/23202\/revisions\/23228"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/icv-controlling.com\/en\/wp-json\/wp\/v2\/media\/23207"}],"wp:attachment":[{"href":"https:\/\/icv-controlling.com\/en\/wp-json\/wp\/v2\/media?parent=23202"}],"wp:term":[{"taxonomy":"events-series","embeddable":true,"href":"https:\/\/icv-controlling.com\/en\/wp-json\/wp\/v2\/events-series?post=23202"},{"taxonomy":"events-category","embeddable":true,"href":"https:\/\/icv-controlling.com\/en\/wp-json\/wp\/v2\/events-category?post=23202"},{"taxonomy":"events-tags","embeddable":true,"href":"https:\/\/icv-controlling.com\/en\/wp-json\/wp\/v2\/events-tags?post=23202"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}